RHV paving project, October 2019
Beginning Monday, October 28th, we will begin a 3-phased paving project at Reid-Hillview Airport. This project will replace the disintegrating asphalt at the Zulu end of each hangar row and under the south-facing section of the four shelter buildings. These areas are large generators of FOD and repairing them should greatly reduce the propensity for small rocks on the taxiways and taxilanes.

(click on images for a larger version)
Phase 1 October 28 and 29.
Phase one is to replace the asphalt at the Z end of the hangars between the ends of taxilanes H, I, J, K, L, and M. During this phase, taxiway Z will be closed between H and M row and the intersections of Z and C will be closed as will the intersection of Z and D. If you have a plane parked on these rows and want to use it during this time, you are welcome to move it temporarily to an open tie-down. (see below)

(click on image for a larger version)
Phase 2, October 30
Phase 2 replaces the asphalt at the Z end of the hangars between the ends of taxilanes P, Q, R, S, T and U. During this phase taxiway Z will be closed between the 31 runup area and taxilane P. Taxiway A and B will also be closed to Taxiway Z. If you have an airplane parked in this area and would like to use it this week, you are welcome to move it temporarily to an open tie-down. (see below)

(click on image for a larger version)
Phase 3, October 30 - November 13
Phase 3 of the project will be to replace the asphalt on the southern side of the four shelter buildings. This phase will start on Wednesday 10/30 and require that all aircraft and equipment currently stored in a shelter be temporarily moved to an open tie-down by the end of the day next Monday, 10/28. Any aircraft that have not been moved by then will be relocated by airport personnel. Due to the nature of this project, it is expected to take up to two weeks to complete with a currently scheduled completion date of November 13.
Phase 3 will also affect access to the following hangars as large paving equipment will be working on taxilanes R and T to complete the work on the shelters: R1, R3, R5, R7, R11, R13, R15, R17, R19, T1, T3, T5, T9, T11, T13, T15, T17 and T19. If your aircraft is parked in one of these hangars and you would like to access it during the construction project, you are welcome to relocate it to an open tie-down. (see below). While we expect it to take a couple of weeks before shelter tenants can move back, the paving part of this project should be completed by Friday, November 1.

(click on image for a larger version)
During this project, large paving equipment will be moving around the airport and utilizing taxilanes adjacent to their work area. Please exercise extreme vigilance when operating your airplane in one of these areas and plan some extra time into your schedule to accommodate the various taxiway and taxilane closures. It is also important to recognize that all of the dates provided are subject to change based on a variety of circumstances.
Temporary parking locations
The following tie-down spaces are currently vacant and available for your temporary use while this paving project is on-going. If you decide to use one, please send an email to [email protected] with your name, tail-number and temporarily parking space number. Airport Operations staff will then install new tie-down ropes and make sure your aircraft is secured.
A Row: 1,3,4,5,6,7,8,9,10,11,13,14,15,16,17,18,19,20,21,22,23,24,25,26,27,28,29,30,31,32
B Row: 1,3,5,7
H Row: 9, 15, 25
I Row: 4,6,10,14,16,18,20,22,24,26,28,30
M Row: 26, 28,30,32
N Row: 2,3,4,6,7,8,9,10,12,13,14,15,16,18,19,21,23,24,25,27,29
O Row: 3,5,9,12,13,14,15,16,17,18,19,20,21,22,24,26,28
P Row: 4,8,10,12,14,16,18,20,22,24
We apologize for the short notice on this project. While we have talked about it internally for a while, this week it became apparent that by moving quickly we could get this much-needed paving project done next week.
If you have any questions please don’t hesitate to contact Femi, Ken or Eric by telephone (408-918-7700) or email.
Eric Peterson
Director County Airports
[email protected]
x27722
Ken Betts
Assistant Director County Airports
[email protected]
x27706
Femi Odunbaku
Airport Operations Supervisor
[email protected]
X27707