RHV | Planning for pavement management | 3-06-0225-14 | $50,350 | 95% | 08-15-2011, X 07-01-2011, X | 09-12-2011 | 05-10-2011 a, s, F85 |
RHV | Noise Mitigation Measures for Residences within 65-69 DNL | 3-06-0225-13 | $450,000 | 95% | 06-23-2006 | 06-20-2007 | 06-19-2007 |
RHV | Install perimeter Fencing and Gates - Phase 2 | 3-06-0225-12 | $551,300 | 95% | 04-27-2007 | 08-20-2007 | 04-10-2001 |
RHV | Install Noise Monitoring System | 3-06-0225-11 | $ 1,200,000 | 95% | 06-23-2006 | 06-16-2006 | 04-29-2003 ,S |
RHV | Signing and marking modifications: rehabilitate apron, phase 2 | 3-06-0225-10 | $435,000 | 95% | 04-14-2005 | 07-05-2005 | 03-22-2005 |
RHV | Acquire security enhancements (perimeter fence, gates and access control) | 3-06-0225-09 | $ 554,500 | 95 % | 06-23-2003 | 08-11-2003 | 04-29-2003 |
RHV | Improve airport drainage (hangar taxilane and apron areas), phase II; rehabilitate apron (approx. 144,000 s.f.); rehabilitate road access (approx. 60,000 s.f.); install perimeter fencing and gate; install navaids (wind indicator, segmented circle, beacon tower); rehabilitate Runway 13L-31R REIL and pilot controlled lighting | 3-06-0225-08 | $774,100 | 90% | 04-11-2002 | 09-18-2002 | 04-10-2001 03-22-2005 07-17-2006 |
RHV | Apron/taxiway drainage improvements, apron rehab, access road rehab, security fence and gates, wind indicators and segmented circle, REIL, PCL, beacon tower and electrical service rehab. | 3-06-0225-07 | $180,000 | 90% | 04-11-2001 | 08-15-2001 | 04-10-2001 |
RHV | Conduct Master Plan Study | 3-06-0225-06 | $280,000 | 90% | 09-14-1999 05-23-2000 | 09-22-2000 09-27-1999 | 09-19-2000 |
RHV | FAR Part 150 Airport Noise Compatibility Planning Study | 3-06-0225-05 | $168,000 | 90% | 04-17-1997 | 08-10-1998 | 09-29-1998 |
RHV | Runway/taxiway rehabilitation, apron rehabilitation, lighted airfield signs, drainage, and reconstruction of perimeter access road. | 3-06-0225-04 | $1,748,250 | 90% | 08-20-1998 | 09-03-1998 | 09-29-1998 |
RHV | Runway/Taxiway rehab - Originally to create/add tiedowns | 3-06-0225-03 | $539,863 | 90% | 08-15-1988 | 09-07-1988 | 08-03-1988 |
RHV | Expand aircraft tiedown apron including drainage, fence, tiedowns, lighting/markings | 3-06-0225-02 | $900,000 | 90% | 04-08-1984 | 05-14-1984 10-06-1985 | 04-20-1984 03-08-1984 06-26-1984 07-08-1996 |
RHV | Land acquisition/airport development (5.1 acres) | 8-06-0225-01 | $22, 145 | 53.72% | 04-13-1971 | 06-08-1971 | 06-22-1971 |
RHV | Install apron floodlighting; construct apron extension (approx. 100,000 sq. ft) including tie-downs; construct apron edge taxiway extension (30 ft. x 400 ft.) | 9-04-128-C907 | $30,145 | 53.62% | 10-21-1968 | 01-21-1969 | 09-10-1969 |
RHV | Installation of MI Taxiway Lighting System and Ducts | 9-04-128-D906 | $12,000 | 53.63% | 04-08-1968 | 07-03-1968 | 07-19-1968 |
RHV | Construction of aircraft parking apron including tie-downs (approximately 150,000 s.f.); relocation of remote control panel from vault to control tower; lighting of ramp parking area. | 9-04-128-D805 | $37,215 | 53.63% | 05-01-1967 07-24-1967 | 10-19-1967 | 04-21-1967 06-09-1967 06-23-1966 |
RHV | Construct Apron with tiedowns and a drainage system on the same side of the airport. | 9-04-128-D604 | $78,708 | 53.64% | 04-23-1966 | 06-21-1966 | |
RHV | Land Acquisition Parcels 03-1/-3-2, clear/drain site, runway/taxiway construction, apron, fence, waterline | 9-04-128-D503 | $346.570 | 53.96% | 03-09-1964 | 10-26-1964 | 09-13-1965 |
RHV | Land Acquisition Parcels 1, 2 & 3 | 9-04-125-D201 | $363,285 | 53.89 % | 05-23-1963 | 10-26-1962 | 06-25-1962 |
RHV | Land Acquisition Parcels 1, 2 & 4, relocate Cunningham Ave | 9-04-125-D402 | $398,010 | 53.89 % | 03-12-1963 | 09-14-1963 | 10-17-1963 |
Airport | FAA Project Description | FAA Grant Number | Grant Amount | FAA Participation Percentage | Applicant Date | Award Date | BOS Action Date |
E16 | Reimbursement grant for pavement rehabilitation. | 3-06-0229-12 | $700,000 | 08-18-2020 | 08-09-2021 | 06-23-2020 | |
E16 | Planning Grant - Pavement Management | 3-06-0229-09 | $52,250 | 95% | 08-15-2011, X 07-01-2011, X | 09-12-2011 | 05-10-2011 a, s |
E16 | Prepare and Environmental Assessment (This grant was returned to the FAA due to inability of AEF to fund CEQA requirements) | 3-06-0229-08 | $400,000 | 95% | 06-17-2008 | 03-22-2005 | |
E16 | Install Miscellaneous NAVAIDS, Install Perimeter Fencing | 3-06-0229-07 | $554,000 | 95% | 1 2 3 | 08-13-2007 | 03-22-2005 |
E16 | Remove obstruction for approach protection | 3-06-0229-06 | $ 150,000 | 95% | 04-14-2005 | 06-14-2005 | 03-22-2005 |
E16 | Acquire security enhancement (perimeter fence, gates and access controls); Install AWOS IIIP | 3-06-0229-05 | $529,000 | 95% | 06-23-2003 | 08-12-2003 | 04-29-2003 |
E16 | Install Fire Water Line Extension (approx. 2,000 lf); Construct Access Road (approx 20' x 1,100') and security access control gate (2 ea), Phase 1 | 3-06-0229-04 | $300,000 | 95% | 07-05-2002 | 09-18-2002 | 06-04-2002 |
E16 | Airport Master Plan for South County Airport | 3-06-0229-03 | $235,000 | 90% | 09-14-1999 04-11-2001 | 09-18-2002 08-06-2001 | 04-10-2001 |
E16 | FAA approved (4/83) and BOS agreed (9/87) upon FAA payment of 1,215,000 for airport runway project improvements with the 1982 airports masterplan | 3-06-0229-02 | $1,215,000 | 90% | 09-18-1987 | 09-01-1987 | |
3-06-0229-01 | |||||||
E16 | Land Acquisition Parcel Nos. 822-13-37, 38, 43, 44, 45, 46, 47, 48, 49, 50, 51, 54, 55, 70, 71, 72, 77, 80, 82, 86, 102, 104 (250+/- acres) | $2,050,000 | 06-12-1970 | ||||
E16 | 1. Land Acquisition Parcel Nos. 13-37, 38, 43, 44, 45, 49, 50, 51, 52, 54, 70, 71, 72, 76, 77, 80, 81, 82, 85, 86, 87 (180+ Acres) 2. Land Acquisition Parcels Nos. 13-46, 47, 55, 68, 72 (70+/- acres, including clear zone & access at Southerly end) | $1,780,000 | n/a | 10-01-1968 | denied 05-23-1969 | 10-21-68 | |
E16 | Land Acquisition | $2,10,000 | n/a | 11-16-1967 | denied 04-25-1968 | ||
E16 | Land Acquisition | $1,942,000 | n/a | 04-03-1967 | pulled by BOS | 06-05-67 | |
Airport | FAA Project Description | FAA Grant Number | Grant Amount | FAA Participation Percentage | Applicant Date | Award Date | BOS Action Date |
PAO | Planning Grant - Pavement Management | 3-06-0182-08 | $57,000 | 95% | 08-15-2011, X 07-01-2011, X | 09-12-2011 | 05-10-2011 a, s |
PAO | Rehabilitate Access Road | 3-06-0182-07 | $525,000 | 95% | 08-13-2007 | ||
PAO | Security enhancement (perimeter fence, gate, access control), design only; install weather reporting equipment (AWOS) and pilot controlled lighting. | 3-06-0182-06 | $300,000 | 95% | 07-13-2005 | 08-02-2005 | 03-22-2005 |
PAO | Rehabilitate Access Road (Embarcadaro Road) and install security gate | 3-06-0182-05 | $450,000 | 90% | 06-23-2003 | 08-12-2003 | 04-29-2003 |
PAO | Conduct Masterplan Update | 3-06-0182-04 | $135,000 | 90% | 09-14-1999 05-23-2000 | 08-22-2000 08-06-2001 | 09-19-2000 |
PAO | Reconstruct/overlay apron (approx. 700,000 sq.ft.) including tiedown anchors and marking | 3-06-0182-03 | $1,033,817 | 90% | 09-14-1994 | 09-30-1994 | 04-21-1996 |
PAO | Runway/parallel taxiway overlay (approx. 280,000 sq.ft.); reconstruct/overlay apron (approx 100,000 sq.ft.) including tiedown anchors and marking; drainage improvements, apron security lighting; and security fencing (approx. 7,000 LF) including automatic drive gates | 3-06-0182-02 | $1,200,000 | 90% | 08-17-1993 | 09-21-1993 | 09-28-1993 |
PAO | FAR 150 Noise Study | 3-06-0182-01 | $85,230 | 90% | 08-07-1987 | 08-30-1988 | 09-27-1988 |
PAO | Construct aircraft parking apron including tie-downs (220,000 sq ft) | 9-04-052-7006 | $85,000 | 53.72% | 08-15-1969 | 12-18-1969 ltr | 12-30-1969 |
PAO | Site preparation; fill for Runway 12L/30R and dike construction. Construction of aircraft parking apron (approx. 130,000 sq.ft.), drainage and tie-downs including conformance to existing apron | 9-04-052-D905 | $128,279 | 53.62% | 07-15-1968 | 03-07-1969 | unknown |
PAO | Construct Apron area (approx. 360,000 sq.ft.). Reconstruct and widen parallel taxiway with connecting taxiways and holding apron | 9-04-052-D602 | $99,006 | 53.64% | 05-02-1966 | 06-20-1966 | |
PAO | Installation of MI taxiway lights, relocation of remote control console from vault to control tower, installation of cable between existing beacon and vault, and installation of cable duct to service runway and wind cone lighting | 9-04-052-D804 | $12,922 | 53.63% | 03-11-1967 | 05-23-1968 | 05-27-1968 |
PAO | Construct levees, place site fill, and relocate discharge lines from existing storm drainage pumping plant | 9-04-032-D803 | $121,284 | 53.63% | 06-19-1967 | 12-26-1967 | 12-27-1967 |
PAO | Overlay, mark and light (MIRL) runway (65' x 2500') including shoulder preparation and drainage; construct apron (approximately 205,000 sq. ft.); install airport beacon and tower; taxiway guidance signs, lighted wind cone, and vault | 9-04-052-D501 | $64,461 | 53.96% | 11-04-1963 | 10-14-1964 | 11-04-196 |